Drone Surveys services Project Overview

Internal Alterations and wall removal within a commercial restaurant application.

This project was based in a tenement at duke street where internal walls were required to be removed to add bathroom space for customers. The works also involved removing internal walls where new toilets, stores and customer sitting space was required. These alterations gave a more open plan view of the restaurant.

Steel frames and Beams on padstones were used to achieve these wall removals as the walls were load bearing. Where the wall removal was required to achieve an opening for customers to go to the toilets a beam was proposed on padstones. As the existing wall was weak in nature it was proposed that new engineering brick piers were to be constructed on pad foundations to achieve the bearing strength.

To provide more space internally a picture frame of 203 UB was proposed onto 100mm SHS columns. The frame was designed to be within the floor space.

We prepared and managed the necessary approvals including the building warrant process and provided an end to end service with as little disturbance to the client’s renovations.

 

Drone Surveys services Project Overview

Internal Alterations and wall removal within a commercial restaurant application.

This project was based in a tenement at duke street where internal walls were required to be removed to add bathroom space for customers. The works also involved removing internal walls where new toilets, stores and customer sitting space was required. These alterations gave a more open plan view of the restaurant.

Steel frames and Beams on padstones were used to achieve these wall removals as the walls were load bearing. Where the wall removal was required to achieve an opening for customers to go to the toilets a beam was proposed on padstones. As the existing wall was weak in nature it was proposed that new engineering brick piers were to be constructed on pad foundations to achieve the bearing strength.

To provide more space internally a picture frame of 203 UB was proposed onto 100mm SHS columns. The frame was designed to be within the floor space.

We prepared and managed the necessary approvals including the building warrant process and provided an end to end service with as little disturbance to the client’s renovations.

 

In this project, Lead Structural Ltd. has been appointed by SNRG to carry out a roof condition assessment for the roof at The Dragon Studios, Pencoed, Bridgend which is a Commercial Hotel. The scope of the services pertained in this document is a detailed assessment of the roof condition of the building within the site boundary to ascertain suitability in relation of the installation of PV Panels. A Drone survey for the site has been carried out with the help of qualified structural inspectors and a full site aerial reconnaissance has taken place using a 4K capable Quadcopter drone has been deployed and flown over the building at various heights to capture a series of images.

Drone Surveys Services provided